Evaluating lot output time forecast achievability in a wafer fab with a systematic procedure

Yu Cheng Lin, Tin-Chih Chen*

*Corresponding author for this work

研究成果: Review article

摘要

A systematic procedure is proposed in this study for output time forecast achievability evaluation in a wafer fab (fabrication plant), which is a critical task to the wafer fab. At first, a BPN is used to predict the output time of a wafer lot. Subsequently, a set of fuzzy inference rules (FIRs) is established to evaluate the achievability of an output time forecast, which is defined as the possibility that the fabrication on the wafer lot can be finished in time before the output time forecast. Managerially, achievability is as important as the other two performance measures in this field: precision and efficiency. However, the evaluation of achievability has not been investigated in traditional studies.

原文English
頁(從 - 到)1868-1874
頁數7
期刊WSEAS Transactions on Systems
5
發行號8
出版狀態Published - 1 八月 2006

指紋 深入研究「Evaluating lot output time forecast achievability in a wafer fab with a systematic procedure」主題。共同形成了獨特的指紋。

引用此