Upgrade of SRRC booster extraction system

J. P. Chiou*, J. S. Chen, C. S. Fann, C. H. Ho, K. T. Hsu, S. Y. Hsu, C. S. Hwang, K. K. Lin, Jeng-Tzong Sheu, T. S. Ueng

*Corresponding author for this work

Research output: Contribution to conferencePaperpeer-review

1 Scopus citations

Abstract

It is planned to upgrade the SRRC booster from 1.3 GeV to 1.5 GeV for full energy injection into the storage ring before the end of 1999. Based on the technical specification and operation experience, it is concluded that some of the subsystem components need to be rebuilt, such as the magnet power supply systems and beam extraction elements. A review of the power supply system will be reported elsewhere. In this report, the brief review of the beam extraction process is given according to the 1.5 GeV parameters. The test result of a modified kicker magnet is presented.

Original languageEnglish
Pages1450-1452
Number of pages3
DOIs
StatePublished - 1 Dec 1999
EventThe 18th Biennial Particle Accelerator Conference - New York, NY, USA
Duration: 27 Mar 19992 Apr 1999

Conference

ConferenceThe 18th Biennial Particle Accelerator Conference
CityNew York, NY, USA
Period27/03/992/04/99

Fingerprint Dive into the research topics of 'Upgrade of SRRC booster extraction system'. Together they form a unique fingerprint.

Cite this