Fuzzy back-propagation network approach for estimating the simulation workload

Tin-Chih Chen*

*Corresponding author for this work

Research output: Contribution to journalArticlepeer-review

1 Scopus citations

Abstract

Estimating the time required for simulating a factory online is a crucial topic in manufacturing. However, this topic has rarely been discussed. A fuzzy back-propagation network (FBPN) approach for estimating the workload of a simulation task according to the required simulation time is proposed in this paper. In the proposed FBPN approach, tasks for which simulation times cannot be effectively estimated are considered as outliers and excluded, and therefore, more appropriate lower and upper bounds on the simulation time can be set. Thus, the ranges of all simulation times can be efficiently narrowed; however, this decrease is achieved at the expense of a slight decrease in the hit rate, which is still tolerable. A real case containing data of 90 simulation tasks was used to validate the proposed methodology. In addition, two existing FBPN methods, the adaptive-network-based fuzzy inference system method and the Chen (Comput Ind Eng 66:834–848, [2013]) method, were applied to these tasks for comparison. The experimental results showed that the proposed methodology was superior to the two existing FBPN methods in estimating precision and accuracy.

Original languageEnglish
Pages (from-to)1707-1715
Number of pages9
JournalNeural Computing and Applications
Volume27
Issue number6
DOIs
StatePublished - 1 Aug 2016

Keywords

  • Back-propagation network
  • Fuzzy
  • Simulation
  • Workload estimation

Fingerprint Dive into the research topics of 'Fuzzy back-propagation network approach for estimating the simulation workload'. Together they form a unique fingerprint.

Cite this