Wei-Chih Wang

Professor

20002021

Research output per year

If you made any changes in Pure these will be visible here soon.

Personal profile

Research Interests

Project Management,Construction Simulation,Cost Estimation and Schedule Control,Construction Procurement

Experience

Education/Academic qualification

PhD, University of California, Berkeley

External positions

Fingerprint Dive into the research topics where Wei-Chih Wang is active. These topic labels come from the works of this person. Together they form a unique fingerprint.

  • 1 Similar Profiles

Network Recent external collaboration on country level. Dive into details by clicking on the dots.

Projects

比較點雲模型與建築資訊模型以輔助工程進度量測

Wang, W.

1/08/2031/07/21

Project: Government MinistryMinistry of Science and Technology

水保工程數量計算要領與參考手冊暨CAD圖資標準化

Wang, W.

13/05/2030/04/21

Project: Government MinistryOther Government Ministry Institute

產學合作計畫-結合LINE聊天機器人與建築資訊模型之行動管理系統

Wang, W.

1/11/1931/10/20

Project: Government MinistryMinistry of Science and Technology

比較點雲模型與建築資訊模型以輔助工程進度量測

Wang, W.

1/08/2131/07/22

Project: Government MinistryMinistry of Science and Technology

土木工程學系109年4月至6月土木技術服務(材料實驗室)(公家機構)

Wang, W.

1/04/2030/06/20

Project: Government MinistryOther Government Ministry Institute

Research Output

建築資訊模型與數值地形模型之整合系統及其整合方法

Wang, W-C., 1 Jan 2020, Patent No. I 681365

Research output: Patent

A BIM-based conceptual cost estimation model considering structural analysis and design

Wu, C. L., Wang, K. C. & Wang, W-C., 1 Jan 2018.

Research output: Contribution to conferencePaper

  • 1 Scopus citations

    Applying BIM and visualization techniques to support construction quality management for soil and water conservation construction projects

    Wang, K. C., Wang, S. H., Kung, C. J., Weng, S. W. & Wang, W-C., 1 Jan 2018.

    Research output: Contribution to conferencePaper

  • 1 Scopus citations

    BIM- and mobile-based system for supporting facility maintenance management

    Lin, C. Y., Wang, K. C., Kuo, T. Y., Yang, L. H. & Wang, W-C., 1 Jan 2018.

    Research output: Contribution to conferencePaper

  • Conceptual cost estimations using neuro-fuzzy and multi-factor evaluation methods for building projects

    Wang, W-C., Bilozerov, T., Dzeng, R-J., Hsiao, F. Y. & Wang, K. C., 2 Jan 2017, In : Journal of Civil Engineering and Management. 23, 1, p. 1-14 14 p.

    Research output: Contribution to journalArticle

    Open Access
  • 5 Scopus citations